Talks
________ 1998-99 _______
1)
Fast simulation of ttH channel
2 april 1998, Grenoble, ATLAS meeting.
here also transparencies
.
2)
Top reconstruction
november 1998, CERN, Top WG meeting
3)
TRT testbeam 99 argon data analysis
3 december 1999, CERN, TRT meeting
________ 2000 __________
4)
Working with CompHEP events
9th february 2000, CERN, Higgs WG
5)
ttbb background to ttH in PYTHIA and CompHEP
October 4th, 2000, CERN, Higgs WG
6)"Porownywanie generatorow Monte-Carlo" November 23rd,2000, IFJ: ATLAS Group Weekly meeting
________ 2001 __________
7)
TRT testbeam analysis for ToT method of particle ID
talk prepared for ATLAS seminar at IFJ but not given yet (a very very unlucky talk - not the first time when not given). Oh, yes! Finally i've given it today: 29th of March! But better see talk number 9.
8)
Bozon Higgsa w kanalach multi-b-jetowych w ATLASie
,
seminarium
w IPJ Warszawa, 30 marca 2001 oraz IFJ Krakow, 24-go kwietnia 2001 (po polsku).
9)
Time over Threshold on Sector Prototype
, Talk given at TRT workshop in Istanbul, May 8th, 2001.
10)
Prezentacja na obronie doktoratu
10-go lipca 2001 (po polsku).
11)
Three transparecnies
with very preliminary results of CP determination in ttH channel presented in Lund, September 13, 2001.
12)
Jets, b-jets, tau-jets and ETmiss in ATLAS
talk at LHC Seminar 2001, 25th of Ocotber 2001, Chia, Italy
13)
The ATLAS detector and the light Higgs boson search
, Seminar of G.A.M., 20 Dec 2001, Universite Montpellier II.
________ 2002 __________
14) "Celeste i poszukiwania Ciemnej Materii", IFJ, 3 Stycznia 2002
15)
"Low energy gamma trigger in AMS"
, Gamma Working Group of AMS experiment, CERN, April 15th, 2002
16)
"Low energy gamma trigger in AMS - episod III"
, G.A.Montpellier, June 11th, 2002
17)
"ECAL trigger rates for low energy thresholds"
, CERN, June 24th, 2002
18)
AMS-gamma: about trigger and testbeam
, CERN, October 11th, 2002
19)
Update of trigger studies
CERN, November 26th, 2002
________ 2003 __________
20)
Update of trigger studies
CERN, January 7th, 2003
21)
ECAL-gamma trigger: status report
CERN, February 17th, 2003
22) Preliminary results on correction of transverse leakage of the ECAL, CERN, July 2nd 2003
23)
Dark Matter search with AMS-02
, EPS Conference, Aachen, 17th of July 2003
24)
Common noise algorithms for AMS-02 tracker
, CERN, October 13th, 2003
25)
Transverse leakage in ECAL
, CERN, October 18th 2003
________ 2004 __________
26)
GSI 2003 beamtest results on data reduction
, January 16th, 2004
27)
GSI beamtest: some results concerning data reduction
, April 2004
28) Eksperyment AMS-02, seminarium ATLASa w IFJ, 29 kwietnia 2004
29) Moje prace w AMSie, seminarium ATLASa w IFJ, 6ty maja 2004
30)
Experyment AMS na Stacji Kosmicznej
, seminarium teoretyczne w Instytucie Fizyki UJ, 18-ty maja 2004
31)
About efficiency of TDR algorithms (GSI 3002 beam test)
, Montpellier AMS Tracker Workshop, 22 June 2004
32)
About possibility of observation of Dark Matter halo in gamma rays with AMS-02
, Roma La Sapienza, July 9th 2004
________ 2005 __________
33)
Calibration in CERN2004 combined beamtest
, CERN, Jan 21st, 2005
34)
TRK calibration issues
, CERN AMS Tracker meeting, Feb 9th 2005
35)
Preliminary results on antideuterons in AMS-02
, CERN, July 7th, 2005
36)
Cosmic ray astrophysics with AMS-02
, ICRC2005, August 9th, 2005
________ 2006 __________
37)
Indirect search for Dark Matter with AMS experiment
, Cracow, Epiphany 2006, January 6th 2006
38)
About the possibility of observation of antideuterons in AMS02
, AMS Analysis Meeting, CERN, April 26th, 2006
39)
About the possibility of observation of antideuterons in AMS02 - summary of the efforts
AMS TIM meeting, CERN, April 27th 2006
40)
Dark Matter search in AMS
, seminarium Warszawskiej Grupy Neutrinowej, 19 maj 2006
41)
Perspectives on antideuteron search with AMS experiment
, Seminario di fisica dei campi e particelle, Roma La Sapienza, November 3rd 2006.
________ 2007 __________
42)
Wire Scanned and downstream magnets
, LHC Technical Board, June 7th 2007
43)
Wire Scanner and downstream magnets
, Join meeting of Collimation and Machine protection WS, CERN, June 15th 2007
________ 2008 __________
44)
How we modify settings and when MASTER is changed
small presentation on LHC Machine Protection Safety - comissioning Working Group meeting, CERN, January 9th, 2008
45)
Beam Wire Scanner - answers
LHC Technical Board, CERN, January 10th 2008
46)
Carbon Fibers - report
new WS meeting, CERN April 15th 2008
47) Operational challenges of LHC (machine protection), ATLAS meeting, IFJ Krakow, May 20th 2008
48)
Procedure of production, verification and transfer of threshold values to LSA
, BLM Audit, CERN, June 10th, 2008
49)
Update on quench analysis
, CERN, December 16th, 2008
50)
BLM thresholds for Collimators
, CERN, December 17th, 2008
________ 2009 __________
51)
BLMs on Triplets - preliminary study
, CERN, IR upgrade WG, February 14th, 2009
52)
BLM quench threshold estimates on MB magnet
, CERN, February 16th, 2009
53)
Preliminary results of wire-breaking MD
, CERN, February 17th, 2009
54)
BLM Quench Level threshold for Steady State losses
, CERN, Beam Comissioning WG, March 31st, 2009
55) Wstep do akceleratorow, CERN, lecture for students, June 2nd, 2009
56)
BLM comparison threshold settings with loss measurements and management of threshold storage
, CERN, BLM Audit, June 15th, 2009
57)
Wstep do akceleratorow
, CERN, lecture for polish high-school students, July 7nd, 2009
58)
Drive beam losses in CLIC module
, CLIC module WG meeting, CERN, August 31st, 2009
59)
Wstep do akceleratrow
, CERN, lecture for polish teachers, September 22nd, 2009
60)
Preliminary results from BLM system (masked dump test)
, CERN, LHC Hardware Commissining meeting, November 10th, 2009
________ 2010 __________
61)
BLM signals at overinjection in IP8
, CERN, LHC Injection and Beam Dump working group, February 2nd, 2010
62)
Wstep do akceleratorow
, CERN, lecture for polish students, March 22nd, 2010
63)
Update on BLM specification
CERN, CLIC OMPWG, March 25th, 2010
64)
Wstep do akceleratorow
CERN, Polish Teachers Program, April 12, 2010
65)
Introduction to accelerators
CERN, English Teachers Program, June 9th, 2010
66)
Impact of the RC filters on BLM thresholds
MPP meeting, July 28th, 2010
67)
BLM Thresholds on Superconducting Magnets
, CERN, August 18th, 2010
68)
Shall we modify BLM Thresholds on Superconducting Magnets?
, MPP, CERN, September 3rd, 2010
69)
Preliminary analysis of quench test
, Beam Commissioning WG, CERN, October 19th, 2010
70)
Modification of thresholds on Cold Magnets
, BLM Threshold WG, CERN, October 25th, 2010
71)
Planning of the quench test with Wire Scanner
, BLM Threshold WG, CERN, October 29th, 2010
72)
Preliminary analysis of quench test
, Machine Protection Panel, CERN, October 29th, 2010
73)
Quench test with wire scan
, Machine Protection Panel, CERN, November 12, 2010
________ 2011 __________
74)
Is BLM system ready to go to higher intensities?
, LHC Performance Wokshop, Chamonix, January 26, 2011
75)
Results of Wire Scanner quench test
, Machine Protection Panel, CERN, February 11, 2011
76)
LHC Transverse profile monitors studies (MD on May 6th, 2011)
, LHC Study WG, CERN, May 24th, 2011
77)
The LHC Beam Loss Monitoring system
, PH Detector Seminar, CERN, June 10th, 2011
78)
Quench limits
, Collimation review, CERN, June 15th, 2011
79)
BLM aspects of R2E MD
, BLM theshold WG, CERN, August 3rd, 2011
80) "Jak fizycy przyśpieszają cząstki", Wykład dla uczniów, CERN, September 22nd, 2011
81) "Highlights of IPAC11", together with Adam Jeff, BI Seminar, CERN, September 23nd, 2011
82) "Jak fizycy przyśpieszają cząstki", Wykład dla nauczycieli polskich, CERN, October 10th, 2011
83) "Introduction to accelerators", Presentation for Estonian and British teachers, CERN, October 27th, 2011
84)
"Summary of mini-workshop on Cryogenic BLMs"
, BI seminar, CERN, November 4th, 2011
85)
Introduction to accelerators for teachers
CERN, November 30th, 2011
85)
Quench tests MDs for 2012
LHC Study WG, CERN, December 8th, 2011
86)
Beam Instrumentation performance overview
LHC Operation Workshop, Evian 2011.12.13
________ 2012 __________
87)
Quench limits
LHC Performance Workshop, Chamonix 2012.02.06
88)
Quench test strategy WG - Introduction
Quench test strategy WG, CERN, 2012.03.16
89)
Beam Interaction with Thin Materials - heat deposition, cooling phenomena and damage limits
, invited talk at BIW12, Newport News, 2012.04.18
90) Beam Interaction with Thin Materials , BI Seminar, CERN, 2012.05.04
91)
Current BLM thresholds in IR7
, 133 LMC, CERN, 2012.05.16
92)
Status of Beam Gas Ionization Monitor
, LHC Beam Operation Comittee, CERN, 2012.07.10
93)
Introduction to accelerators for Korean teachers
, CERN, 2012.08.09
94)
Cryogenic BLMs
, TE-TM meeting, CERN, 2012.09.04
95)
Status of Beam Gas Ionization Monitor
, Machine Study WG, CERN, 2012.09.14
96)
Proposed Change of BLM Positions in the Arcs During LS1
, MPP meeting, CERN, 2012.10.12
97)
UFO Quench test using ADT - result of the preparation MD
, QTSWG meeting, CERN, 2012.10.19
98)
First look at wire-scanner generated BLM beam dump at 4 TeV on 2012.10.12 01:44:31
Emittance meeting, CERN, 2012.10.24
99)
Proposal for Beam Induced Quench Tests at the end of 2013 run
, LMC, CERN, 2012.10.24
100)
UFO-timescale quench test preparation - preliminary results
, LHC Study WG, CERN, 2012.10.26
101)
Steady-state quench limits
, Collimation WG, CERN, 2012.10.29
102) Jak działa LHC, wykład dla nauczycieli, CERN, 2012.11.19
103)
Post Mortem analysis of carbon fibers from Wire Scanners
, Emittance WG, CERN, 2012.11.21
104)
4 TeV dumps generated by Wire Scanners
, Emittance WG, CERN, 2012.12.05
105)
Draft planning of beam induced quench tests at the end of 2013 run
, LMC, CERN, 2012.12.05
106) BGV: modify BGI vacuum chamber of construct a new one? BGV WG, CERN, 2012.12.07
107)
How to lose 1E8 protons in 1 ms and keep it under control?
MPP, CERN, 2012.12.14
________ 2013 __________
108) "BGI status", emittance meeting, CERN, 2013.01.16
109) "Latest news concerning planning of quench tests", QTSWG, CERN, 2013.01.18
110)
The latest quench test planning
MPP, CERN, 2013.01.25
111)
Almost final planning of beam-induced quench tests at the end of 2013 run
LMC, CERN, 2013.01.30
112)
Status of BGI
Emittance meeting, CERN, 2013.02.06
113)
The first results of the quench test
, LMC, CERN, 2013.03.27
114)
Summary of experience with LHC and SPS IPM monitors in 2011 & 2012
, Workshop on
Non-Invasive Beam Size Measurement for High Brightness Proton and Heavy Ion Accelerators
, CERN, 2013.04.15
115)
Specification of CERN-PS IPM
, Workshop on Non-Invasive Beam Size Measurement for High Brightness Proton and Heavy Ion Accelerators, CERN, 2013.04.16
116)
The quench limits for transient losses
, Collimation Review, CERN, 2013.05.30
117)
SPS Ionization Profile Monitor - experience from 2012/2013
, MSWG, CERN, 2013.07.02
118) Wstep do fizyki akceleratorów, wykład dla studentów ECh, CERN, 2013.09.03
119)
Beam Instrumentation in LHC
, NCBJ, Warszawa, 2013.09.18
120)
BGI monitors for the PS and SPS
, BI-LIU meeting, CERN, 2013.10.03
121)
Cryogenic BLMs
, TE-TM meeting, CERN, 2013.10.08
122)
Cryogenic BLMs
, LSC meeting, CERN, 2013.10.11
123) Proposal of guidelines for presentations using quench test data (for discussion) and paper presentation, QTAWG meeting, CERN, 2013.10.18
124)
Status of quench tests analyses
, LHC Beam Operation Committee, CERN, 2013.10.22
125)
Beam Gas Ionization monitor for PS
, open Medipix3 meeting, CERN, 2013.11.20
________ 2014 __________
126)
Which tests shall be included in quench paper?
, Quench Test Analysis WG, CERN, 2014.01.17
127)
Status of PS BGI
, LIU-PS, CERN, 2014.02.11
128)
Proposal for PS Beam Gas Ionization monitor
, BI Tech Board, CERN, 2014.05.15
129)
BLMs and thresholds at 6.5/7 TeV
, LHC Beam Operation Workshop, Evian, 2014.06.03
130)
Proposal for PS Beam Gas Ionization monitor
, Design kickoff, CERN, 2014.06.25
131)
PS IPM news
, PS LIU meeting, CERN, 2014.07.29
132)
Beam losses at Hera and Tevatron
, Workshop on Beam Induced Quenches, CERN, 2014.09.15
133)
Setup of LHC Quench Tests
, Workshop on Beam Induced Quenches, CERN, 2014.09.15
134)
PS IPM height
, PSIPM designers meeting, CERN, 2014.09.22
135)
Wstep do fizyki akceleratorów
, Polish teachers program, CERN 2014.10.21
136)
Status of SPS IPM
, MSWG, CERN, 2014.10.24
137)
Beam loss mechanisms, measurements and simulations in LHC (quench tests)
Invited talk at HB2014, East Lansing, Michigan, USA, 2014.11.12
________ 2015 __________
138)
Experience with LHC Beam Loss Monitoring system (and lessons for FAIR)
FAIR Comissiong and Control WG, GSI, 2015.11.18
________ 2016 __________
139)
Analysis of IBHS files
Operateursschulung, GSI, 2016.02.04
140)
pyECLOUD code and main results
IPM Simulation Workshop, CERN, 2016.03.03
141)
Report on the Status of GSI Accelerator Data Archiving and Analysis
, Workshop on Accelerator Operation, Shanghai, SSRF, 2016.09.21
142)
About GSI, thin target thermal simulations and Ionization Profile Monitors
, J-PARC Seminar, 2016.10.12
143)
Second look at the results of 2012 analysis of triplet thresholds
, CERN,
CryoBLM meeting
, 2016.12.05
________ 2017 __________
144)
Progress on HADES beamline works
, GSI Machine Meeting, 2017.03.28
145)
Analysis of optical IPM signal
, IPM17 wWorkshop, GSI, Mai 22, 2017
146)
Summary of 2016 workshop
, IPM17 wWorkshop, GSI, Mai 23, 2017
147)
Current status of HEST LSA setup
, Operations beam physics and techniques salon, GSI, August 30, 2017
________ 2018 __________
148)
Applications of machine learning in beam diagnostics
, IAP seminar, Frankfurt University, January 12, 2018
149)
Ionization Profile Monitors (in hadron machines)
, invited presentation at Topical Workshop on Emittance Measurements for Light Sources and FELs, ALBA, January 30, 2018
150)
HEST status and Commissioning Plans
, GSI Beam Time Retreat, Seeheim, February 23, 2018
151)
HEST status
, Machine Meeting, GSI, April 10, 2018
152)
HEST status - survey
, Machine Meeting, GSI, April 24, 2018
153)
HEST alignment
, Machine Meeting, GSI, May 8th, 2018
154)
Machine learning in beam diagnostics
, PSI May 14, 2018
155)
HEST status and commissioning plans
, Machine Meeting, GSI, May 22nd, 2018
156)
Application of Machine Learning for the IPM-based beam profile neasurement
, Invited talk at HB2018, Daejeon, Korea, June 21, 2018
157)
Application of Machine Learning for the IPM-based beam profile neasurement
, Accelerator Seminar, GSI, August 16, 2018
158)
HEST status - radiation alarms
, Machine Meeting, GSI, Aug 28th, 2018
159)
HEST status
, Machine Meeting, GSI, Sep 25th, 2018
160)
HEST past and future
, ACC Leaders Retreat, Oct 19th, 2018
161)
Status of HADES beam line
, Salon, GSI, Nov 7th, 2018
________ 2019 __________
162)
HEST status report
, Machine Meeting, GSI, Jan 8th, 2019
163)
G2H beam line news
, G2H beam line meeting, GSI, Jan 9th, 2019
164)
HEST Betrieb
, Operateurschulung, GSI, Jan 15th, 2019
165)
HEST Commissioning (and other aspects)
, Beam Time Retreat, Jan 23rd, 2019
166) Optics measurements in HEST, Beam physics saloon, GSI, Feb 13th, 2019 (no slides, results too preliminary)
167)
Overview of linac injector designs for medical synchrotrons
, Medical applications weekly meeting, CERN, 10 May 2019
168)
New ion therapy machine design study
,
SPS Losses and Activation Working Group
, CERN, June 5, 2019
169)
Injector linac layout (work in progress)
, Joint NIMMS-SEEIIST weekly meeting, CERN, June 21, 2019
170)
Injector linac - design choices (work in progress)
, Joint NIMMS-SEEIIST weekly meeting, CERN, July 26, 2019
171)
Ion intensities
, Joint NIMMS-SEEIIST weekly meeting, CERN, November 29, 2019
________ 2020 __________
172)
SEEIIST layout
, Joint NIMMS-SEEIIST weekly meeting, CERN, January 31, 2020
173)
Update on SEEIIST accelerator areas
, Joint NIMMS-SEEIIST weekly meeting, CERN, February 7, 2020
174)
Horizontal Beam Line for Therapy
, Joint NIMMS-SEEIIST weekly meeting, CERN, February 21, 2020
175)
Undesigning Horizontal Beam Line for Therapy
(status report), Joint NIMMS-SEEIIST weekly meeting, CERN, February 28, 2020
176)
Therapy beam lines
(status report), Joint NIMMS-SEEIIST weekly meeting, CERN, March 13, 2020
177)
Beam lines
(status report), Joint NIMMS-SEEIIST weekly meeting, CERN, March 20, 2020
178)
Beam lines optics
Joint NIMMS-SEEIIST weekly meeting, in the Cloud, April 17th, 2020
179)
Radiation shielding - before touching a computer
Joint NIMMS-SEEIIST weekly meeting, May 15th, 2020
180)
HEST status
GSI Machine Meeting, June 6th, 2020
181)
HEST perfromance and operational risks
3rd GSI Beamtime retreat, June 18th, 2020 (with Christoph Hessler)
182) Plans for the next 6-month period: Beam Instrumentation for SEEIIST, Joint NIMMS-SEEIIST weekly meeting, CERN, September 4th, 2020
183)
Sarajevo Linac Project
Joint NIMMS-SEEIIST weekly meeting, CERN, October 30th, 2020
184)
Sarajevo Linac Project
Meeting with HVEE, November 26th, 2020
185)
Helium-ion therapy system
IOP Workshop on accelerator technology for particle therapy
, December 8th, 2020
186)
Options for the Sarajevo ion source programme
CERN NIMMS meeting, December 18th, 2020
________ 2021 __________
187) A report on the UK workshop on accelerator technology for particle therapy, CERN NIMMS meeting, January 15th, 2021
188)
HEBT power consumption
, NIMMS power consumption meeting, CERN, January 28th, 2021
189)
Plans and challenges for SEEIIST
, I.FAST-REX Kickoff meeting, February 9th, 2021
190)
HEBT power consumption - update
, NIMMS power consumption meeting, CERN, February 23rd, 2021
191)
Beam Instrumentation for SEEIIST facility
, NIMMS meeting, CERN, April 16th, 2021
192)
Introduction to Accelerator Physics
,
Heavy Ion Therapy School
, May 18th, 2021,
(video)
193)
Introduction to Beam Instrumentation
, Heavy Ion Therapy School, May 20th, 2021
194)
Sarajevo Linac Project
, Heavy Ion Therapy School, May 21st, 2021,
(video)
195)
Accelerator complex for next generation heavy ion therapy and and research facilities
, Heavy Ion Therapy School, May 21st, 2021
196)
Workpackage 7, Task 7.3
, SEEIIST HITRI+ kick-off meeting, June 2nd, 2021
197)
Status of WP7 task 3
, HITRIplus meeting, November 19, 2021
________ 2022 __________
198)
SEEIIST-NIMMS design
, HITRIplus school, July 4th, 2022 (with Elena Benedetto)
199)
Nowe projekty terapii jonowej w Europie
, Instytut Onkologii, Gliwice, wrzesień 2022
200)
Medical applications of accelerators
, Sarajevo School of High Energy Physics, October 15, 2022
201)
Application of machine learning algorithms to the reconstruction of the actual beam profiles from the space charge distorted profiles in ionization profile monitors
, 5th ICFA Workshop on Space Charge, Knoxville, TN, October 25, 2022
________ 2023 __________
202) Transverse beam profile measurements for extreme beams, Transmutex headquarters, Geneva, March 3, 2023
203)
How high-power accelerators damage thin wires?
, workshop on
Low Density Materials for Beam Instrumentation
, CERN, Geneva, June 20th, 2023
204)
RRL Wagon B - preliminary results
, Nachbesprechung Strahlentwicklung, PSI, Sep 5th, 2023
205)
RRL Strahlentwicklung results
, Nachbesprechung Strahlentwicklung, PSI, Sep 19th, 2023
206) Radial probes, fluorescence monitors and beam loss monitors, Transmutex headquarters, Geneva, September 28, 2023
207)
Strahlentwicklung results
, Nachbesprechung Strahlentwicklung, PSI, Oct 24th, 2023
208)
Comparison of MXC1 and BX2 beam current measurements
, Nachbesprechung Strahlentwicklung, PSI, Dec 19th, 2023
209)
Initial test of CMC-HV4
HIPA Diagnostic Upgrade Meeting, PSI, Dec 19th, 2023
________ 2024 __________
210)
Strahlentwicklung results: RRL and EIC interlocks
, Nachbesprechung Strahlentwicklung, PSI, Jul 3rd, 2024
211)
Emission of Secondary, Thermionic and Delta Electrons from Thin Targets
, tutorial talk at IBIC24 September 2024
212)
Strahlentwicklung October 10th, 2024 - MXB2B and RRL
, Nachbesprechung Strahlentwicklung, PSI, Oct 16th, 2024
213)
SoM-CAM test with FW4Y signals
, HIPA Diagnostic Upgrade Meeting, PSI, Nov 5th, 2024
214)
SoM-CAM test with FW4Y signals - second attempt
, Nachbesprechung Strahlentwicklung, PSI, Nov 20th, 2024
215)
Investigation of RRL signal shift between IN and OUT scans
, Nachbesprechung Strahlentwicklung, PSI, Nov 20th, 2024
216)
SoM-CAM test with FW4Y signals - third attempt and MRI9B measurements
, HIPA Diagnostic Upgrade Meeting, PSI, Dec 3rd, 2024 217)
Investigation of RRL signal shift between IN and OUT scans
, Nachbesprechung Strahlentwicklung, PSI, Dec 4th, 2024