SIS18_TE_ESR_STANDARD optics

(return)

The version from February 2018 is obsolete: does not contain injection septum and the definition of accelerator zones at injection has changed. Version from May 17th was has a problem with polarity of ESR injection septa (GE01MU4I). This is corrected in October 8th version, which also includes correction for systematic misalignment of beam line due to FAIR works. In October 2019 it was stressed that polarities of GTE5QD21 and GTE5QD22 magnets are inverted. New optics was generated.

MIRKO->twiss

SE_S.twiss

config.xml

config.xml

LSA strength

SIS18_TE_ESR_STANDARD_strength_20180228.csv

LSA twiss

SIS18_TE_ESR_STANDARD_twiss_20180228.csv

LSA strength

SIS18_TE_ESR_STANDARD_strength_20180417.csv

LSA twiss

SIS18_TE_ESR_STANDARD_twiss_20180417.csv

LSA strength

SIS18_TE_ESR_STANDARD_strength_20180517.csv

LSA twiss

SIS18_TE_ESR_STANDARD_twiss_20180517.csv

LSA strength

SIS18_TE_ESR_STANDARD_strength_20181008.csv

LSA twiss

SIS18_TE_ESR_STANDARD_twiss_20181008.csv

Preliminary optics:

sis18_te_esr_standard_betas_20180417.png

MIRKO envelope:

sis18_te_esr_mirko_ann.png


2020-06-17 16:00