SIS18_HFS_STANDARD optics
This optics has been generated from twiss file provided by Sebastian Ratschow (MIRKO export). It was generated for Dry Run 4 (January 2018). Optics functions are shown below:
MIRKO->twiss |
|
all MIRKO files |
|
config.xml |
|
LSA strength |
|
LSA twiss |
Instrumentation
In the FRS target area (TS1MU2-TS2QT11) the FRS team is responsible for instrumentation. Upstream of the target area there is diagnostic chamber GTE1DK1 which contains particle counter assembly (plastic scintillator, ionisation chamber and SEM detector), scintillating screen and SEM grid. A beam trafo is also located upstream GTE1DK1 in GTE1DT1.