December 9th
- working in block mode: 2 hours for HADES, 1 hour for HTC
- HADES beam: 107Ag45+, 1580 MeV/u, spill of 10s
HTC beam: 107Ag45+, 600 MeV/u, spill of 1s, low intensity (<1e6 in SIS)
- HADES: scanning 3x3 mm surface of diamond detector with parallel beam looking for the target. Target found outside of diamond detector area. Diamond readjustemt necessary.
- beam on target optics (other during the scan - similar):
the corresponding Paramodi save: 2018-12-09_10-28-18_SIS18_SLOW_HADES_20181206_210727.C1.txt
HTD in the evening, new optics with small focus on target (<1 cm):
2018-12-09_23-18-28_SIS18_SLOW_HTD_kleiner_Fokus_HTDDF1.C1.txt
(this optics does not look like the one proposed by Petra or me, but it does the job)